This brief reports what Atlassian's 10-Q, filed 2025-08-14, states, and nothing else. Every item below is a sentence the filing contains, quoted exactly and verified character-for-character against the document fetched from EDGAR. No inference is drawn and no claim is made about what any figure means.
The figures
| Metric | Value | Period |
|---|---|---|
| Compensation related to curtailment and energy sales | $223 thousand and $373 thousand | the three and six months ended June 30, 2025 |
| Annual premium for the utility deposit bond | $14 thousand | — |
| Utility deposit bond | $717 thousand | — |
Every figure above is quoted from the filing; the sentence it was read from appears under its beat below.
The evidence, by beat
seat vs consumption / usage-based pricing mix shift
We received $223 thousand and $373 thousand of compensation related to curtailment and energy sales during the three and six months ended June 30, 2025 which is recorded as “Curtailment and energy sales” in the consolidated statement of operations.
There were no curtailment and energy sales in the three and six months ended June 30, 2024.
The Company pays an annual premium of $14 thousand for the utility deposit bond and the cost of the bond is amortized ratably over the twelve month coverage period.
The Company includes energy costs and external co-location mining hosting fees in cost of revenues.
Depreciation of mining machines is included within “Depreciation and amortization” in the consolidated statements of operations.
Bitcoin earned by the Company through its mining activities are included within operating activities on the accompanying consolidated statements of cash flows.
The Company has a Will Serve agreement with the local energy company that provides credits based on amount of electricity provided and based on reducing power consumption upon peak demand times.
The Company utilizes a third-party broker to facilitate our participation in demand response programs offered by the Southwest Power Pool (“SPP”), a regional transmission organization that manages the electric grid and wholesale power for the central United States.
The broker analyzes our forecasted power consumption, market value of Bitcoin and day-ahead energy prices to determine whether our estimated mining revenues will exceed the energy cost incurred by the Company to operate our mining equipment (“breakeven price”) for each hour of the following day.
In lieu of maintaining a cash utility deposit with the energy provider for our Oklahoma mining site, we purchased a utility deposit bond which guarantees that the energy provider would receive payment from the third party surety up to an amount of $717 thousand in the event the Company defaults on utility charges.
competitive displacement / win-loss / platform consolidation
The filing names this beat, but no statement in it verified as a verbatim quote, so none is reported here.
guidance raised/cut, outlook change
The filing names this beat, but no statement in it verified as a verbatim quote, so none is reported here.
cost action / restructuring / headcount
The filing names this beat, but no statement in it verified as a verbatim quote, so none is reported here.
Verification ledger
- 10 statements proposed by the extractor
- 10 verified verbatim against the fetched filing (100%)
- 0 discarded — not quotable character-for-character
The verbatim check contains no model: the extractor proposes a statement, and a deterministic substring match against the fetched text decides whether it is admissible. A proposal that does not verify is dropped.
This brief publishes no inference and no synthesis. The publication's inference layer must clear a measured second-lab confirmation threshold before it may appear; it has not, so it is absent by rule rather than by omission.